The AI Boom Runs on Pipe. Can you keep up?

Every AI model you've heard of, ChatGPT, Gemini, Grok, runs on servers inside massive data centers. Those data centers run hot. Keeping them cool requires extensive piping infrastructure.

Cooling loops. Chilled water systems. HVAC distribution. Liquid cooling systems tied into facility water networks. GPU power has moved from roughly 700W class accelerators to around 1,000W class systems and continues to increase, driving much higher rack densities and increasing the need for advanced cooling.

There are currently over 770 hyperscale data center projects in various stages of planning, construction, or fit out worldwide. Each one is a highly infrastructure intensive build, with significant demand for piping systems from the ground up.

Category Press Releases